MENU service case
 Website construction website design Beijing website construction high-end website production company Shangpin China
We create by embracing change
360 ° brand value__
simplified Chinese character
Simplified Chinese English

Shangpin China Joins Hands with Beisheng Internet to Create a New Chapter in Website Construction

Type: Shangpin Dynamic Learn more

Preparation of network plan

Source: Shangpin China | Type: website encyclopedia | Time: October 29, 2014
With the development of science and technology and the progress of mankind, many things related to the network have entered people's lives, such as: Website Design , online stock speculation, online securities, network maps, etc. Now let's introduce the network diagram. When it is determined that a project adopts the CPM plan, there are four methods for preparing the actual network diagram: one is the meeting consultation method, the second is the plan group method, the third is the entrusted expert method, and the fourth is the staff plan group method.

1、 Meeting consultation methods
 
The main personnel related to the project construction will form a consultation group to decide the preliminary arrangement of the network through the meeting. This method is called the meeting consultation method. The relevant personnel include the personnel of the contractor, the site leader, the factory representative and the representative of the design institute. The team should have full decision-making power, and the relevant personnel should implement the promises so as to ensure that the network plan works. The specific method is to hold a meeting to discuss each process of the project one by one. For each part of the discussion, a part of the network diagram will be drawn on the blackboard in turn, and then reviewed by the team. The network obtained through this discussion is relatively rough, and only after the group reaches an agreement can the relevant information be sorted into a formal network diagram. Generally, a preliminary list of process items can be prepared before the meeting negotiation, or a list of similar projects in the past can be used as a reference, which can greatly improve the efficiency of the meeting and enable the negotiation to make decisions directly against the development network. An important factor in a successful consultative meeting is leadership. If the leadership cannot determine the direction, the talks can only be general or contentious.

 Network plan

2、 Planning team approach
 
Sometimes the method of holding a meeting with all parties and the main responsible person participating in the consultation is not applicable: because the number of participants is insufficient, it is difficult to make decisions, and too many participants will make the discussion inefficient. At this time, an alternative method, namely the planning group method, can be adopted. The number of planning team members is limited to about three, including EPC project personnel, project management personnel and CPM experts. Due to the small number of people, the network map is prepared quickly. Of course, the decisions made must be communicated to the relevant departments, which is its shortcoming.

When using this method, we also draw a network diagram while negotiating, and draw a sketch on the blackboard as a preliminary plan. Of course, such a plan may need to be modified several times to complete a network diagram. For a project plan, the network diagram must be adapted to the project, and the project cannot be adapted to the network diagram by putting the cart before the horse. A correct network plan should have great adaptability, which is the outstanding advantage of the network diagram, because it clearly reflects the content of the plan to all aspects of personnel, so that others can understand and provide suggestions.

3、 Entrusted expert method
 
This method is in the charge of the CPM expert, who will prepare the network after obtaining the opinions from the general contracting principal and all responsible persons. This method takes the least time for engineers and is effective when used properly. However, it must be noted that due to the lack of relevant key personnel to make decisions through joint consultation, it often occurs that the construction personnel do not regard this plan as a specific implementation plan, so that the plan cannot be implemented.

4、 Planning staff team approach
 
Larger general contracting units or factories often set up their own special staff planning team to consider the network plan of the project. Although this method is often used, attention must be paid to prevent the tendency of leaving the construction site and site management personnel. Sometimes only the construction site needs to provide services to the staff planning team, rather than the staff planning team providing services to the construction site fully and timely. As a result, many planning teams, like printing presses, print out a large number of planning documents, which have little practical effect.
Source Statement: This article is original or edited by Shangpin China's editors. If it needs to be reproduced, please indicate that it is from Shangpin China. The above contents (including pictures and words) are from the Internet. If there is any infringement, please contact us in time (010-60259772).
TAG label:

What if your website can increase the number of conversions and improve customer satisfaction?

Make an appointment with a professional consultant to communicate!

* Shangpin professional consultant will contact you as soon as possible

Disclaimer

Thank you very much for visiting our website. Please read all the terms of this statement carefully before you use this website.

1. Part of the content of this site comes from the network, and the copyright of some articles and pictures involved belongs to the original author. The reprint of this site is for everyone to learn and exchange, and should not be used for any commercial activities.

2. This website does not assume any form of loss or injury caused by users to themselves and others due to the use of these resources.

3. For issues not covered in this statement, please refer to relevant national laws and regulations. In case of conflict between this statement and national laws and regulations, the national laws and regulations shall prevail.

4. If it infringes your legitimate rights and interests, please contact us in time, and we will delete the relevant content at the first time!

Contact: 010-60259772
E-mail: [email protected]

Communicate with professional consultants now!

  • National Service Hotline

    400-700-4979

  • Beijing Service Hotline

    010-60259772

Please be assured to fill in the information protection
Online consultation

Disclaimer

Thank you very much for visiting our website. Please read all the terms of this statement carefully before you use this website.

1. Part of the content of this site comes from the network, and the copyright of some articles and pictures involved belongs to the original author. The reprint of this site is for everyone to learn and exchange, and should not be used for any commercial activities.

2. This website does not assume any form of loss or injury caused by users to themselves and others due to the use of these resources.

3. For issues not covered in this statement, please refer to relevant national laws and regulations. In case of conflict between this statement and national laws and regulations, the national laws and regulations shall prevail.

4. If it infringes your legitimate rights and interests, please contact us in time, and we will delete the relevant content at the first time!

Contact: 010-60259772
E-mail: [email protected]