Regular evaluation of CPM plan is the most effective method for plan monitoring and control. During plan evaluation, whether the logical order is re determined or the operation duration is changed, it is an adjustment to the original network plan. The purpose of adjusting the network diagram is to make necessary modifications to the logical sequence of the network and the duration of the process according to the progress of the project, and recalculate to make the construction period meet the requirements of the specified completion date. During calculation, the duration of all completed operations is set to zero. The duration of ongoing processes shall be determined according to their actual completion time. Any change in the sequence of operations, addition or reduction of operations, and renumbering of operations are logical modifications that require recalculation, that is Website Design For the dynamic adjustment of the graph, the first few adjustments usually make major changes to the entire network plan. However, when the project enters the comprehensive construction stage, only a few arrows need to be modified for daily adjustment. Of course, the scope of logic modification cannot be determined. After the logic modification is listed on the network diagram, the network can be recalculated from the time of modification, and the steps and methods are the same as the original calculation. The calculation must be correct, the calculation results must be analyzed and adjusted, and the critical path may change accordingly.
 
 Network dynamic adjustment

It is one of the main functions of network planning technology to control project progress by using network diagram. The main reason why network planning technology can be widely used and has today's achievements is that it can check, adjust and control projects at any time with dynamic planning methods. Although the network has been preliminarily planned, it may not be realized or completed successfully according to the original plan. Because during the implementation of the network plan, many uncertain factors and possible accidents are included. Therefore, regular inspection and adjustment of the network plan is the most effective way to supervise the implementation of the plan and control the project progress, as well as an important work to ensure the realization of the expected goals.

1、 Inspection and adjustment of each process on the critical path
 
The critical path determines the total construction period, and the shortening or extension of any process (key process) on the critical path will affect the progress of the whole project. Therefore, the focus of inspection and adjustment should first analyze the key processes, study whether these processes may be advanced or delayed, analyze the reasons at any time, and take measures to adjust. For example, when the duration of some processes on the critical path is shortened or extended, the time parameters of subsequent processes and non critical processes on the critical path will be changed accordingly. Therefore, it is necessary to make necessary adjustments to these processes and recalculate the time parameters to make them meet the requirements.

2、 Inspection and adjustment of processes on non critical routes
 
When the operation time of some operations on the non critical path is extended, but within the total time difference of the operations, the time parameters of the corresponding operations are changed, but the total duration is not affected. In general, the network plan does not need to be adjusted. If the extended time of non critical process exceeds the available time difference, the critical path may be transferred and a new critical path may be generated. At this time, the non critical path needs to be checked and appropriate adjustment should be made to meet the requirements of the construction period.

3、 Check network number and adjust network logical relationship
 
When some operations need to be added during the implementation of the network plan, it is necessary to check the number, readjust the logical relationship, and calculate the adjusted critical path and total duration. If the original network plan number considers the possibility of adding an operation and has an alternative number, it is not necessary to change the original number of some operations to add an operation arrow and item, and add a blank number.

4、 Adjustment report of network
 
Another function of dynamic adjustment is to provide the management department with objective information about project progress at regular intervals. If the CPM network chart is not used for the regular report, the project relationship will be blurred like the bar chart. Regular adjustment report in the form of CPM network diagram is prepared according to the actual project completion.

The weekly CPM progress report shall be determined by the construction unit and submitted to the relevant management department. However, it is necessary to coordinate with relevant units and personnel to make adjustments at regular intervals, so as to exchange information in a timely manner and make relevant adjustment reports more practical. The relevant personnel assisted by other units shall cooperate closely with the personnel of the construction unit, and the construction unit shall truthfully and comprehensively reflect the actual situation of things even if the situation is not ideal. This kind of adjustment with the participation of personnel from other units can help the personnel of the construction unit not only see the part of the problem, but also see the whole picture of the project. For example, in the construction of a certain type of cargo ship, when discussing the painting process, the original plan adopted by the factory was that the paint shop would construct a section and paint from one end layer by layer, so the painting work of the whole ship would take 40 days. After the calculation of network planning parameters, it is found that the painting process is on the critical path, and the painting progress must be accelerated, so it is decided to use two sections for construction, and paint at both ends in layers. In order to reduce the auxiliary time, movable and adjustable scaffolds are also used, which greatly shortens the construction time and ensures the construction progress of the whole ship.
 
5、 Adjustment cycle of network
 
The construction unit shall mark the progress of the project on the CPM network diagram every day and submit a report according to the CPM progress every week. There is no specific regulation on how often to adjust the network diagram, which depends on the project. For example, two equipment overhaul projects of Nylon Plant with a construction period of 30 days need to be adjusted every day. For projects with a construction period of six months to one year, it is OK to adjust every other week. For projects with a construction period of more than one year, it is enough to adjust once every half month in the first year. Sometimes, because the work is in full swing and the project construction is in peak stage, the adjustment time can be shortened to once a week, and then restored to once every half month.
Source Statement: This article is original or edited by Shangpin China's editors. If it needs to be reproduced, please indicate that it is from Shangpin China. The above contents (including pictures and words) are from the Internet. If there is any infringement, please contact us in time (010-60259772).
TAG label:

What if your website can increase the number of conversions and improve customer satisfaction?

Make an appointment with a professional consultant to communicate!

* Shangpin professional consultant will contact you as soon as possible

Disclaimer

Thank you very much for visiting our website. Please read all the terms of this statement carefully before you use this website.

1. Part of the content of this site comes from the network, and the copyright of some articles and pictures involved belongs to the original author. The reprint of this site is for everyone to learn and exchange, and should not be used for any commercial activities.

2. This website does not assume any form of loss or injury caused by users to themselves and others due to the use of these resources.

3. For issues not covered in this statement, please refer to relevant national laws and regulations. In case of conflict between this statement and national laws and regulations, the national laws and regulations shall prevail.

4. If it infringes your legitimate rights and interests, please contact us in time, and we will delete the relevant content at the first time!

Contact: 010-60259772
E-mail: [email protected]

Communicate with professional consultants now!

  • National Service Hotline

    400-700-4979

  • Beijing Service Hotline

    010-60259772

Please be assured to fill in the information protection
Online consultation

Disclaimer

Thank you very much for visiting our website. Please read all the terms of this statement carefully before you use this website.

1. Part of the content of this site comes from the network, and the copyright of some articles and pictures involved belongs to the original author. The reprint of this site is for everyone to learn and exchange, and should not be used for any commercial activities.

2. This website does not assume any form of loss or injury caused by users to themselves and others due to the use of these resources.

3. For issues not covered in this statement, please refer to relevant national laws and regulations. In case of conflict between this statement and national laws and regulations, the national laws and regulations shall prevail.

4. If it infringes your legitimate rights and interests, please contact us in time, and we will delete the relevant content at the first time!

Contact: 010-60259772
E-mail: [email protected]